Kerry's 330 GT Restoration
About 9 AM, the excavator and operator arrived. By 11 AM, the whole building was down, being crunched up in little pieces and loaded into the dumpster.
The dumpster got filled, so it was time to dig out the stumps from the trees previously cut down.
So tomorrow the remainder of the demolition will get loaded once the dumpster is emptied. Then the leveling and fill will be done to make the single level floor.