Kerry's 250 GT Pininfarina Coupe Restoration (1643GT)

July 2020

Most of the work (118 hours) has been on getting parts ready for chroming.

The front, rear and door window frames had pits and nicks filled in.  Same with the bumpers.

The radiator blind was dis-assembled to be cleaned and painted.

Mold release on the tires and valve stems was cleaned up.

Some metal work on the body for areas that still needed work after the primer was applied.