Kerry's 250 GT Pininfarina Coupe Restoration (1643GT)

March 2021

The car has been at Dennison's most of the month with the interior guys coming across the parking lot to check fit, etc. for the pieces that are working on.

The interior pieces are continuing to be finished.  All of the trunk pieces are done and installed.  The carpet padding and some of the carpet are installed.  In addition, leather was glued to the interior of the glove box.  The door panels and arm rests are done.

           

On the mechanical side, the dash is installed with all of the instruments all wired in.

   

The hood and pad are installed, albeit with a lot of work on the hinges so it cleared the radiator and fan etc.  The heater hoses, valve and controls were installed.

       

The door gaskets and doors were installed.

   

All of the body paint interior parts were modified to fit as needed and sent out to the painters.

The final parts such as the wiper trim were sent out for chroming.