Kerry's 250 GT Pininfarina Coupe Restoration (1643GT)
Darren and a helper came the other day and loaded the car along with many bins of parts. I have removed many of the parts that I had already installed as they would be doing it anyway and it saved me some hours of their shop rate. I packed what I could into the car to make the loading easier.
The actual loading didn't take too long. First, the engine, transmission along with the many bins. Then the car was loaded at the rear.
Once the trailer arrived at Butch's shop, the car and bins of parts were unloaded.