Kerry's 330 GT Restoration

Shop Demolition

About 9 AM, the excavator and operator arrived.  By 11 AM, the whole building was down, being crunched up in little pieces and loaded into the dumpster.

The First Bite 9:44
 
Mostly Gone 10:00
 
Crunch Time 10:41 Load It Up 11:08

The dumpster got filled, so it was time to dig out the stumps from the trees previously cut down.

So tomorrow the remainder of the demolition will get loaded once the dumpster is emptied.  Then the leveling and fill will be done to make the single level floor.