Kerry's 250 GT Pininfarina Coupe Restoration (1643GT)

Punch List

Here's the list (so far) of what I need to get done:

  1. Brakes
  2. Cooling
  3. Differential
  4. Electrical
  5. Engine
  6. Engine compartment
  7. Exhaust
  8. Exterior
  9. Fuel
  10. Interior
  11. Miscellaneous
  12. Suspension
  13. Toolkit
  14. Transmission
  15. Trunk
  16. Wheels
    • Stamp the wheels where the original stampings were polished off.
    • Rebuild the spare wheel.

Gee, that doesn't seem too long.  It's just that every line will expand by about ten times before it is complete.

Previous Page    Next Page